FERC Compliance: Requirements, Risks, Checklist & 2026 Guide
The Federal Energy Regulatory Commission (FERC) regulates U.S. energy markets, ensuring efficiency, fairness, and transparency. As an independent agency, its role is crucial in overseeing market operations. FERC’s jurisdiction is especially significant in the renewable energy sector.
Have you ever wondered how FERC enforcement actions can affect your renewable energy projects and compliance efforts? The Federal Energy Regulatory Commission (FERC) is pivotal in shaping the renewable energy sector’s compliance requirements. Understanding FERC’s influence on renewable energy is crucial for ensuring that your operations remain compliant, efficient, and risk-free.
A recent U.S. Department of Energy report highlights that the renewable energy sector is expected to contribute 40% of the nation’s electricity by 2035. This rapid expansion increases the likelihood of regulatory scrutiny and enforcement actions.
Key Takeaways (TL;DR)
- Explore what FERC enforcement actions mean for renewable energy compliance teams
- See how these actions can impact your projects.
- Discuss how you can effectively navigate the evolving regulatory landscape and stay compliant with FERC compliance standards.
FERC compliance is more than meeting regulatory filing deadlines.
For electric utilities, transmission providers, power marketers, natural gas companies, hydropower operators, and other regulated energy organizations, FERC compliance can involve tariffs, market rules, regulatory reporting, operational controls, records, audits, reliability requirements, cybersecurity, and ongoing regulatory change.
The challenge is turning those requirements into work that can be assigned, monitored, documented, and proven.
A strong FERC compliance program should make it possible to answer five questions at any time:
-
Which FERC requirements apply to us?
-
Who owns each requirement?
-
What controls demonstrate compliance?
-
Where is the supporting evidence?
-
What happens when a requirement or control is missed?
This guide explains FERC compliance requirements, FERC vs. NERC compliance, major regulatory areas organizations should monitor, important FERC developments in 2026, and how utilities and energy companies can build an audit-ready compliance program.
What Is FERC Compliance?
FERC compliance is the process of identifying, implementing, monitoring, documenting, and demonstrating adherence to statutes, regulations, Commission orders, tariffs, licenses, reporting requirements, and other obligations administered or enforced by the Federal Energy Regulatory Commission.
The Federal Energy Regulatory Commission, or FERC, is an independent federal agency that regulates important areas of interstate energy activity.
FERC’s jurisdiction includes the interstate transmission and wholesale sale of electricity, interstate transportation of natural gas and oil, certain natural gas infrastructure, hydropower licensing, electric reliability, energy markets, and financial and accounting requirements for regulated companies.
See FERC’s official overview of what it regulates
This broad jurisdiction means there is no single FERC compliance checklist that applies to every energy company.
For example:
A transmission provider may need to manage Commission-approved tariffs and Standards of Conduct.
A wholesale electricity seller may need to manage Electric Quarterly Reports and market-based rate obligations.
A hydropower operator may need to comply with project-specific license conditions.
A registered Bulk-Power System entity may also be subject to applicable NERC Reliability Standards.
Determining exactly which obligations apply is therefore the first step in building an effective FERC compliance program.
Why FERC Compliance Matters
Compliance is central to FERC’s enforcement strategy.
FERC encourages companies subject to its regulations and oversight to establish rigorous compliance programs designed to reduce the likelihood of violations. The Commission also gives significant weight to the effectiveness of a company’s compliance program when determining whether civil penalties or other remedies should apply.
Read FERC’s official compliance guidance
FERC enforcement can involve:
-
Investigations
-
Regulatory audits
-
Market surveillance
-
Civil penalties
-
Disgorgement
-
Refunds
-
Compliance monitoring
-
Corrective actions
-
Settlement agreements
FERC’s enforcement priorities include fraud and market manipulation, anticompetitive conduct, serious violations of mandatory Reliability Standards, threats to energy infrastructure, and conduct that threatens transparency in regulated markets.
The consequences of non-compliance can extend beyond monetary penalties.
Organizations may also face:
-
Increased regulatory scrutiny
-
Corrective-action requirements
-
Compliance monitoring
-
Operational disruption
-
Investigations
-
Legal expenses
-
Management attention
-
Reputational damage
The objective of a mature FERC compliance program should therefore be to identify compliance failures before regulators do.
Who Must Comply With FERC Requirements?
FERC jurisdiction depends largely on what an organization does.
Several types of energy organizations may have FERC compliance responsibilities.
Electric Utilities and Transmission Providers
FERC regulates interstate electric transmission and wholesale electricity sales within its jurisdiction.
Depending on the organization, compliance responsibilities may involve:
-
Transmission tariffs
-
Open-access requirements
-
Transmission planning
-
Regulatory filings
-
Electric reliability
-
Standards of Conduct
-
Market rules
-
Accounting requirements
-
Financial reporting
Utilities also frequently manage FERC requirements alongside state utility regulations, NERC standards, environmental obligations, OSHA requirements, and internal policies.
For a broader look at managing these overlapping requirements, read:
Energy and Utilities Compliance Software: Features, Benefits and How to Choose
Wholesale Power Sellers and Power Marketers
Organizations participating in jurisdictional wholesale electricity markets may need to manage requirements involving:
-
Market-based rate authority
-
Electric Quarterly Reports
-
Commission-approved tariffs
-
Market rules
-
Affiliate relationships
-
Regulatory filings
-
Anti-market manipulation controls
Regulatory teams need processes for identifying changes in ownership, affiliates, assets, and market participation that may create filing obligations.
RTO and ISO Market Participants
Entities participating in Regional Transmission Organization or Independent System Operator markets operate under Commission-approved tariffs and market rules.
Those requirements need to be translated into operational responsibilities.
A tariff should not simply live inside a regulatory or legal repository.
Organizations should identify:
Requirement → Owner → Control → Activity → Evidence
That makes tariff compliance measurable.
Natural Gas Companies
FERC regulates important aspects of interstate natural gas transportation and infrastructure.
Depending on an organization’s operations, requirements may involve:
-
Interstate pipelines
-
Storage facilities
-
LNG facilities
-
Certificates
-
Tariffs
-
Rates
-
Regulatory reporting
-
Project conditions
Hydropower Operators
FERC licenses and oversees more than 1,600 non-federal hydropower projects.
Compliance can include license requirements, inspections, reporting, environmental conditions, safety obligations, project modifications, and other project-specific requirements.
See FERC Hydropower Administration and Compliance
Bulk-Power System Entities
Certain users, owners, and operators of the Bulk-Power System also need to comply with applicable NERC Reliability Standards.
This creates an important distinction between FERC compliance and NERC compliance.
FERC Compliance vs. NERC Compliance
FERC and NERC compliance are closely related, but they are not the same.
FERC is an independent federal regulatory agency.
NERC, the North American Electric Reliability Corporation, serves as the Electric Reliability Organization responsible for developing and enforcing Reliability Standards for the Bulk-Power System, subject to applicable regulatory oversight.
NERC Reliability Standards cover areas such as:
-
Critical Infrastructure Protection
-
Emergency preparedness
-
Transmission operations
-
Protection and control
-
Communications
-
Personnel training
-
Transmission planning
-
Facilities
-
Resource and demand balancing
View current NERC Reliability Standards
The practical distinction looks like this:
| FERC Compliance | NERC Compliance |
|---|---|
| Federal regulatory requirements | Reliability Standards |
| Wholesale electricity markets | Bulk-Power System reliability |
| Interstate transmission | Critical Infrastructure Protection |
| Commission-approved tariffs | Reliability operations |
| Electric Quarterly Reports | Evidence requirements |
| Market-based rate requirements | Compliance audits |
| Standards of Conduct | Spot checks and investigations |
| Market manipulation requirements | Reliability enforcement |
An organization may therefore need to maintain both a broader FERC regulatory compliance program and a specific NERC compliance program.
For organizations managing NERC requirements, see:
VComply’s Guide to Automating NERC Compliance
What Are the Main FERC Compliance Requirements?
There is no universal list of FERC requirements.
However, several areas frequently require formal compliance controls.
1. Tariff Compliance
Commission-approved tariffs can establish detailed operational requirements for transmission providers, generators, marketers, pipelines, and market participants.
For every applicable tariff requirement, organizations should identify:
-
The relevant provision
-
The business process affected
-
The responsible owner
-
The control used to meet the requirement
-
The frequency or trigger
-
Required supporting evidence
-
Review requirements
-
Escalation procedures
The strongest approach creates direct traceability:
Tariff Requirement → Control → Owner → Task → Evidence → Review
This prevents tariff compliance from becoming disconnected from day-to-day operations.
2. Electric Quarterly Reports
Electric Quarterly Reports, or EQRs, are an important recurring FERC obligation for applicable electricity sellers.
FERC uses the EQR as the reporting mechanism for public utilities to meet Federal Power Act section 205(c) requirements concerning rates and charges. EQRs contain information about jurisdictional agreements and wholesale transactions. Certain non-public utilities are also required to submit EQRs.
See FERC’s Electric Quarterly Reports guidance
Strong EQR compliance controls should address:
-
Contract information
-
Transaction data
-
Source-system accuracy
-
Data validation
-
Filing deadlines
-
Internal review
-
Approval
-
Submission
-
Filing confirmation
-
Corrections and refilings
-
Evidence retention
The current filing schedule remains:
| Quarter | Due Date |
|---|---|
| Q1 | April 30 |
| Q2 | July 31 |
| Q3 | October 31 |
| Q4 | January 31 |
These deadlines remain in place while FERC develops its future XBRL-CSV filing system.
3. Market-Based Rate Compliance
Market-based rate authorization can create ongoing compliance responsibilities.
Companies should maintain processes to identify organizational or operational changes that may require additional regulatory analysis or filings.
Changes can include:
-
Ownership changes
-
New affiliates
-
Asset acquisitions
-
Divestitures
-
Corporate restructuring
-
New market activities
-
Changes in business operations
This means compliance teams need to be connected to broader business-change processes.
A commercial transaction can create a regulatory obligation before anyone thinks of it as a compliance event.
4. Standards of Conduct
FERC’s Standards of Conduct for Transmission Providers are contained in 18 CFR Part 358.
Depending on applicability, controls may need to cover:
-
Transmission function employees
-
Marketing function employees
-
Access to transmission information
-
Information sharing
-
Employee transfers
-
Written procedures
-
Training
-
Required disclosures
-
Records
-
Organizational changes
Maintaining a policy is not enough.
Organizations should be able to demonstrate that controls operated and employees followed applicable procedures.
5. Market Manipulation and Trading Compliance
Fraud and market manipulation remain important FERC enforcement concerns.
Organizations engaged in wholesale energy markets should evaluate controls around:
-
Trading behavior
-
Bidding practices
-
Market communications
-
Transaction review
-
Affiliate activity
-
Market data
-
Employee conduct
-
Surveillance
-
Escalation
-
Investigations
-
Compliance training
FERC has also published guidance on effective energy trading compliance practices, emphasizing monitoring systems, management culture, controls, and training.
The exact controls should reflect the organization’s actual market activity rather than relying on a generic code of conduct.
6. NERC Reliability Standards
Organizations subject to mandatory Reliability Standards need to demonstrate that applicable requirements are not just documented but consistently performed.
A useful compliance model is:
Reliability Standard
↓
Requirement
↓
Control
↓
Owner
↓
Activity
↓
Evidence
↓
Finding
↓
Remediation
NERC’s Compliance Monitoring and Enforcement Program includes mechanisms such as compliance audits, self-certifications, investigations, and other monitoring processes.
This makes evidence management particularly important.
Compliance teams should be able to retrieve evidence by requirement instead of searching across email, SharePoint folders, local drives, and individual spreadsheets.
7. Regulatory Filings and Recordkeeping
Depending on the organization, additional FERC obligations can include:
-
FERC forms
-
eTariff filings
-
EQR filings
-
Market-based rate filings
-
Accounting records
-
Transmission reports
-
Natural gas filings
-
Hydropower reports
-
License conditions
-
Certificate conditions
-
Notices
-
Event-driven regulatory submissions
Every filing should have a clear compliance trail:
Requirement + Owner + Trigger + Deadline + Review + Submission + Evidence
What Does FERC Consider an Effective Compliance Program?
FERC has identified four important factors when considering the effectiveness of an organization’s compliance program:
-
Senior management’s role in fostering compliance
-
Effective preventive measures
-
Prompt detection, cessation, and reporting of violations
-
Remediation efforts
These four principles provide a useful framework for designing an operational FERC compliance program.
How to Build an Effective FERC Compliance Program
Step 1: Create a Central FERC Obligations Register
Start with a central inventory of applicable requirements.
For every obligation, record:
-
Regulatory source
-
Citation
-
Plain-language requirement
-
Applicability
-
Legal entity
-
Facility
-
Business unit
-
Requirement owner
-
Frequency
-
Due date
-
Related control
-
Required evidence
-
Related policy
-
Review process
-
Escalation process
This register becomes the foundation of the program.
It also makes it easier to determine whether regulatory requirements have been converted into actual work.
Step 2: Assign Clear Ownership
Every requirement should have a named owner.
Avoid assigning requirements simply to:
-
Compliance
-
Legal
-
Operations
-
Regulatory
-
IT
Instead distinguish between:
Requirement owner: Accountable for compliance.
Task owner: Performs the required activity.
Reviewer: Validates completion and evidence.
Clear ownership helps prevent overdue responsibilities from disappearing between departments.
Step 3: Convert Regulations Into Controls
A regulation tells the organization what must be achieved.
A control describes how the organization will achieve it.
For example:
Requirement: Regulatory filing information must be accurate.
Control: Filing data is reconciled to source records and independently reviewed before submission.
Owner: Regulatory reporting manager.
Frequency: Quarterly.
Evidence: Reconciliation documentation, reviewer approval, final filing and submission confirmation.
This is how FERC requirements become operational.
Step 4: Automate Recurring Compliance Work
Many regulatory responsibilities happen repeatedly.
Compliance teams should automate:
-
Assignments
-
Due dates
-
Reminders
-
Escalations
-
Evidence requests
-
Reviews
-
Certifications
-
Approvals
-
Assessments
The objective is not replacing regulatory expertise.
It is making sure the compliance process designed by regulatory and legal teams is consistently executed.
Step 5: Collect Evidence as Work Happens
A completed task is much less valuable if the organization cannot prove that it happened.
Relevant evidence may include:
-
Regulatory submissions
-
Filing confirmations
-
Approval records
-
System logs
-
Reports
-
Training records
-
Communications
-
Meeting records
-
Review checklists
-
Policies
-
Procedures
-
Testing records
-
Corrective-action documentation
Evidence should be linked directly to the requirement and control it supports.
That makes audit preparation a continuous process instead of an evidence collection exercise performed after an audit request arrives.
Step 6: Test Compliance Controls
Do not assume a control works because it appears in a compliance matrix.
Periodically test:
-
Was the activity completed?
-
Was it completed on time?
-
Was the correct procedure followed?
-
Is the evidence sufficient?
-
Did the reviewer perform the required review?
-
Were exceptions identified?
-
Were failures escalated?
-
Was remediation completed?
Testing makes it possible to identify weaknesses internally before they become regulatory findings.
Step 7: Track Findings Through Remediation
When a potential compliance problem is discovered, create a clear remediation workflow:
Finding → Risk Assessment → Corrective Action → Owner → Deadline → Evidence → Verification → Closure
Leadership should have visibility into:
-
Open findings
-
High-risk issues
-
Overdue corrective actions
-
Repeated failures
-
Affected requirements
-
Affected locations or entities
This makes compliance risk measurable.
For more on connecting compliance and risk in utility organizations:
How to Structure Utility Risk Management
Step 8: Establish a Process for Potential Violations
FERC encourages organizations to respond promptly when potential violations are discovered.
FERC’s self-reporting guidance emphasizes factors including how quickly the organization acted, whether the misconduct was stopped, management involvement, the completeness of the investigation, and remediation.
Read FERC’s official self-reporting guidance
Compliance programs should therefore establish clear internal procedures for:
-
Escalating suspected violations
-
Preserving evidence
-
Investigating the issue
-
Involving legal counsel
-
Stopping ongoing non-compliance
-
Determining whether reporting is required or appropriate
-
Implementing corrective action
FERC Compliance Changes to Watch in 2026
Regulatory change should be part of the compliance program itself.
Two FERC developments are particularly important in 2026.
Order No. 917 and EQR Reporting Changes
FERC issued Order No. 917 on March 19, 2026, changing parts of the Electric Quarterly Report filing process and data collection.
Several reporting changes became effective on May 26, 2026.
Among the changes, FERC no longer requires certain EQR information concerning transmission capacity reassignments, index-price-publisher reporting, and exchange or brokerage services. Material billing adjustments are also now handled through EQR refiling under the updated requirements.
FERC also plans to move EQR reporting to a new XBRL-CSV system.
However, as of August 2026, the Commission has not established the implementation timeline for the XBRL-CSV platform.
The existing quarterly filing deadlines therefore remain unchanged for now.
Follow official FERC Order No. 917 updates
Compliance teams responsible for EQR filings should:
-
Update procedures for requirements already effective
-
Continue following current filing deadlines
-
Track new technical guidance
-
Assess system changes required for XBRL-CSV
-
Plan for testing before implementation
-
Maintain evidence showing process updates
Order No. 1920 Compliance Filings
FERC’s Order No. 1920 introduced significant requirements related to long-term regional transmission planning and cost allocation.
Transmission providers are required to make compliance filings addressing the order’s requirements, including separate requirements related to interregional transmission coordination.
FERC’s schedule includes deadlines spanning 2026 and 2027 depending on the transmission planning region. The Commission’s published schedule was most recently updated on August 19, 2026.
See the current Order No. 1920 compliance filing schedule
Affected organizations should treat Order No. 1920 compliance as a structured project with:
-
Named owners
-
Milestones
-
Applicable requirements
-
Regulatory and legal review
-
Stakeholder engagement
-
Filing deadlines
-
Supporting documentation
-
Final approvals
-
Evidence retention
FERC Compliance Checklist
Use this checklist as a starting point for evaluating your program:
-
Identify applicable FERC regulations, orders, tariffs, licenses, certificates, and reporting requirements.
-
Maintain a centralized FERC obligations register.
-
Assign a named owner to every requirement.
-
Map requirements to operational controls.
-
Identify evidence required for each control.
-
Establish recurring compliance schedules.
-
Automate reminders before deadlines.
-
Escalate overdue activities.
-
Require appropriate review of regulatory submissions.
-
Retain filing confirmations and supporting documentation.
-
Monitor FERC regulatory changes.
-
Track applicable NERC Reliability Standards.
-
Perform periodic compliance risk assessments.
-
Test high-risk controls.
-
Document compliance findings.
-
Assign corrective actions.
-
Track remediation through verified closure.
-
Maintain appropriate employee training.
-
Establish procedures for potential violations.
-
Maintain audit-ready evidence.
-
Report material compliance risks to management.
This checklist is a general starting point. Exact requirements depend on an organization’s jurisdiction, operations, tariffs, licenses, certificates, and other regulatory obligations.
How FERC Compliance Software Helps
FERC compliance becomes difficult when requirements, controls, evidence, risks, and corrective actions are managed separately.
A compliance management system creates a connected structure:
FERC Requirement
↓
Control
↓
Responsible Owner
↓
Compliance Activity
↓
Evidence
↓
Review
↓
Finding
↓
Corrective Action
↓
Management Reporting
This makes compliance easier to monitor across departments, facilities, and legal entities.
VComply helps energy and utility organizations:
-
Centralize regulatory obligations
-
Assign compliance responsibilities
-
Automate recurring activities
-
Send reminders and escalations
-
Map requirements to controls
-
Collect audit evidence
-
Test controls
-
Track compliance risks
-
Manage findings
-
Assign corrective actions
-
Maintain audit trails
-
Report compliance status across locations
Energy organizations can manage FERC requirements alongside NERC, NERC CIP, OSHA, EPA, environmental obligations, cybersecurity controls, policies, and internal compliance requirements.
Explore VComply for Energy and Utilities
For organizations evaluating technology options:
Compare the Best Energy Compliance Management Software for 2026
Instead, it provides the operational structure for executing and documenting the FERC compliance program established by regulatory, compliance, legal, and operational teams.
Make FERC Compliance Continuous, Not Audit-Driven
Strong FERC compliance is not simply about understanding what the regulation says.
It is about making sure the required activity happens, the right person owns it, exceptions are identified, and the organization can demonstrate what occurred.
That requires a connected process:
Requirements → Controls → Owners → Activities → Evidence → Risks → Remediation
When these elements remain in spreadsheets, shared folders, inboxes, and separate departmental trackers, compliance teams spend too much time chasing updates and reconstructing evidence.
A structured compliance program makes responsibilities visible before something becomes overdue.
For energy and utility organizations managing FERC alongside NERC, NERC CIP, OSHA, EPA, environmental requirements, cybersecurity obligations, policies, and enterprise risks, VComply provides a centralized system for turning requirements into accountable work.
See how VComply supports Energy and Utility Compliance
This article provides general information and does not constitute legal advice. Organizations should consult qualified regulatory and legal professionals to determine which FERC requirements apply to their specific operations.
Frequently Asked Questions About FERC Compliance
What is FERC compliance?
FERC compliance is the process of meeting applicable regulations, Commission orders, tariffs, reporting obligations, licenses, certificates, Reliability Standards, and other requirements administered or enforced by the Federal Energy Regulatory Commission.
The exact obligations depend on an organization’s activities and regulatory jurisdiction.
What does FERC regulate?
FERC regulates important parts of interstate electricity, natural gas, oil pipeline transportation, hydropower, and electric reliability.
Its responsibilities include interstate electric transmission, wholesale electricity sales, interstate natural gas transportation, certain energy infrastructure, mandatory reliability standards, market monitoring, and enforcement.
Read FERC’s complete jurisdiction overview
What is the difference between FERC and NERC?
FERC is an independent federal regulatory agency.
NERC is the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards for the Bulk-Power System within the applicable regulatory framework.
FERC compliance extends to areas such as wholesale markets, transmission, tariffs, reporting, market conduct, and other jurisdictional requirements. NERC compliance focuses specifically on applicable Reliability Standards.
What are common FERC compliance requirements?
Depending on the organization, FERC compliance may involve:
-
Electric Quarterly Reports
-
Commission-approved tariffs
-
Market-based rate obligations
-
Standards of Conduct
-
Anti-market manipulation rules
-
Financial and regulatory reporting
-
Natural gas requirements
-
Hydropower license requirements
-
Reliability Standards
-
Project-specific conditions
There is no universal set of FERC requirements applicable to every organization.
What is an Electric Quarterly Report?
An Electric Quarterly Report is FERC’s reporting mechanism through which applicable utilities report information concerning jurisdictional agreements and wholesale electricity transactions.
What changed with EQR compliance in 2026?
Order No. 917 introduced changes to EQR data collection and the future filing process.
Several reporting changes became effective May 26, 2026.
FERC also plans to introduce an XBRL-CSV filing platform, but as of August 2026 the Commission has not established an implementation timeline. Current quarterly filing deadlines remain in place until the new system is implemented.
Does FERC require organizations to have a formal compliance program?
Generally, FERC does not mandate a formal compliance program except in certain circumstances.
However, the Commission strongly encourages regulated organizations to establish effective compliance programs and gives significant weight to those programs when evaluating enforcement remedies and civil penalties.
What does FERC look for in an effective compliance program?
FERC highlights four major elements:
-
Senior management involvement
-
Effective preventive measures
-
Prompt detection, cessation, and reporting of violations
-
Effective remediation
These principles should be reflected in the organization’s actual compliance processes, not simply documented in a policy.
How should utilities prepare for a FERC audit?
Organizations should continuously maintain:
-
Clearly assigned regulatory requirements
-
Documented procedures
-
Effective controls
-
Evidence of completed activities
-
Filing records
-
Review and approval history
-
Training records
-
Internal testing
-
Exception records
-
Corrective-action histories
Audit preparation should happen throughout the year rather than beginning when a request for evidence arrives.
What is FERC compliance software?
FERC compliance software helps organizations manage regulatory requirements, controls, owners, deadlines, recurring activities, evidence, assessments, findings, corrective actions, and reporting.
Software does not determine which legal requirements apply to an organization.
FERC compliance is the process of meeting applicable regulations, Commission orders, tariffs, reporting obligations, licenses, certificates, Reliability Standards, and other requirements administered or enforced by the Federal Energy Regulatory Commission.
The exact obligations depend on an organization’s activities and regulatory jurisdiction.
FERC regulates important parts of interstate electricity, natural gas, oil pipeline transportation, hydropower, and electric reliability.
Its responsibilities include interstate electric transmission, wholesale electricity sales, interstate natural gas transportation, certain energy infrastructure, mandatory reliability standards, market monitoring, and enforcement.
Read FERC’s complete jurisdiction overview
FERC is an independent federal regulatory agency.
NERC is the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards for the Bulk-Power System within the applicable regulatory framework.
FERC compliance extends to areas such as wholesale markets, transmission, tariffs, reporting, market conduct, and other jurisdictional requirements. NERC compliance focuses specifically on applicable Reliability Standards.
Depending on the organization, FERC compliance may involve:
Electric Quarterly Reports
Commission-approved tariffs
Market-based rate obligations
Standards of Conduct
Anti-market manipulation rules
Financial and regulatory reporting
Natural gas requirements
Hydropower license requirements
Reliability Standards
Project-specific conditions
There is no universal set of FERC requirements applicable to every organization.
Order No. 917 introduced changes to EQR data collection and the future filing process.
Several reporting changes became effective May 26, 2026.
FERC also plans to introduce an XBRL-CSV filing platform, but as of August 2026 the Commission has not established an implementation timeline. Current quarterly filing deadlines remain in place until the new system is implemented.
Generally, FERC does not mandate a formal compliance program except in certain circumstances.
However, the Commission strongly encourages regulated organizations to establish effective compliance programs and gives significant weight to those programs when evaluating enforcement remedies and civil penalties.
FERC highlights four major elements:
Senior management involvement
Effective preventive measures
Prompt detection, cessation, and reporting of violations
Effective remediation
These principles should be reflected in the organization’s actual compliance processes, not simply documented in a policy.
Organizations should continuously maintain:
- Clearly assigned regulatory requirements
- Documented procedures
- Effective controls
- Evidence of completed activities
- Filing records
- Review and approval history
- Training records
- Internal testing
- Exception records
- Corrective-action historie.
Audit preparation should happen throughout the year rather than beginning when a request for evidence arrives.
FERC compliance software helps organizations manage regulatory requirements, controls, owners, deadlines, recurring activities, evidence, assessments, findings, corrective actions, and reporting.
Software does not determine which legal requirements apply to an organization.